Large wind farm development wind resources assessment equipment installation training workshop  

        2002 August 5th ¨C 12th the training workshop for equipment installation was held in Huitengxile, it was organized by Longyuan Company, PMO assisted with part of the trainings, and GEC provided the technical support. The engineers and operators from each site and engineers from Longyuan and State Power Company attended the workshop. Met towers were installed successfully during the demonstration. The workshop was closed on time with the efforts.

picture

¡¡ ¡¡ ¡¡

back